HULL CONSTRUCTION

These are in chronological order, construction of the hull and deck started July 1, 1997 and finished July 1998. The boat was built upside down, deck first. The pictures marked with a (*) are displayed upside down to better show the hull shape. Captions in bold are for the pictures that turned out pretty well.


FRAMING:


PLATING:

Outside the boat:

Inside the boat:

Turning the boat over:


FINISHING:

Details:

Painting the boat:

Moving the boat:

Building the shed:

Inside the shed:


Builder:


peter dahl